Home/Staff Welfare Buildings
Design, supply & install

Modular staff welfare & canteen buildings

Canteens, changing rooms, showers, lockers and drying rooms for factories, warehouses, logistics parks and food processing sites, designed around your headcount and shift pattern. We design the building to the Workplace (Health, Safety and Welfare) Regulations, build and fit it out off site while your groundworks happen in parallel, then deliver, crane and install it with days of disruption rather than months of trades. Available in our steel cabin ranges or timber frame ranges, sized from a single canteen module to a full amenity building.

✓Send us your headcount, shift pattern and postcode and we come back with a compliant layout and a fixed quote, usually within two working days.
Typical configurations

From a canteen module to a full amenity building

Most projects land on one of three shapes. All of them scale with headcount, and all can be split across floors or buildings where the site demands it.

Canteen building

Rest and eating space with seating sized to the largest break-time shift, a kitchen or servery run, hot water, fridges and microwaves, plus WCs and wash basins to suit the headcount.

Canteen + changing & showers

The canteen plus segregated changing rooms with showers and lockers, for sites where staff change into workwear or the work is dirty. Separate clean and dirty routes where food hygiene demands it.

Full amenity building

Canteen, changing, showers, lockers, drying room, accessible WC and first aid room in one building: everything the Workplace Regulations ask of a large industrial site, designed as one project.

Choose your build

Two ranges, four specifications

Every layout on this page can be built in either range. The right choice depends on the site, not the floor plan.

Steel cabin: ClassicSteel cabin: PlusTimber frame: StandardTimber frame: Premier
Best forWorking industrial sites, secure yardsIndustrial sites wanting a better staff environmentSites where appearance matters at a working budgetFront-of-house settings and premium staff facilities
ShellGalvanised steel, anti-vandalGalvanised steel, upgraded glazing & insulationTimber frame, steel clad, insulatedTimber frame, upgraded insulation, cladding options
CharacterTough, low maintenance, relocatableTough shell, brighter warmer interiorWarmer look inside and outClosest to a permanent building in look and thermal spec

Not sure which suits your site? Tell us what the building is for and where it stands and we will recommend one with the quote.

Proven layouts

Start from a drawing we have already built

Made to order50ft staff amenity building floor plan with WCs, urinals and wash basins CW-0212

50ft Amenity Building

74 m² · WCs, urinals, basins, accessible provision Sized for large-headcount industrial sites
Made to order32ft staff changing room floor plan with WCs CW-0057

32ft Changing Building

60 m² · changing space with WCs Add showers, lockers and a drying room to suit
Made to order40ft five room staff building floor plan with kitchen and WC CW-0622

40ft Building with Kitchen

74 m² · five rooms, kitchen, WC A canteen-and-office shape many sites start from

These are starting points, not fixed products: rooms, fittings and sizes all move with your headcount. Browse more layouts in the made-to-order catalogue.

Compliance & process

Designed to the regulations, delivered around your operation

The Workplace (Health, Safety and Welfare) Regulations 1992 set what employers must provide: toilets and washing scaled to headcount, somewhere clean to rest and eat, drinking water, and changing and drying facilities where the work requires special clothing. We translate your staff numbers into a compliant room schedule before anything is priced, and the same drawing set supports your Building Regulations application. The full requirements are set out in our guide, what UK employers must provide.

On programme: drawings are signed off first, then the building is manufactured and fitted out while your base and service runs are prepared. Delivery is by lorry with crane set, planned around your shift pattern, and a working site typically loses days rather than months. Sizes, specifications and the order-to-handover timeline are covered in the staff canteen buildings guide.

Recent builds

Real buildings, straight from the workshop

Every photo is a finished, delivered building from our timber frame and steel ranges: canteens, kitchens, partitioned rooms and washrooms fitted out before they leave the workshop.

long modular staff welfare building with anthracite trim staff canteen kitchen run with white units and dark worktop kitchenette run inside a modular welfare building glazed partition rooms inside a modular staff building premier timber frame building with cedar cladding washroom with trough basin and shower cubicles

Get a fixed quote from your headcount

Tell us how many staff the building serves, the shift pattern and your postcode. We come back with a compliant layout and a fixed quote, usually within two working days.

Call 020 8135 0799